You are here

Limassol Del Mar: Closer to the completion of Phase A

05/12/2019 14:58

While the construction works have already reached the 17th floor, the team of the multi-awarded development project Limassol Del Mar is intensively working towards the completion of the structural concrete frame of buildings A and B of the overall project. The completion will come just before the Christmas time.

Currently, the concrete slab of the 17th floor has been casted, as shown on timelapse video. Simultaneously, the 5th floor of building C’ s slab has been casted.

It is worth noting that all the construction phases of the fully licenced project Limassol Del Mar, comply with the international standards of safety and stability requirements.

The multi-award-winning Limassol Del Mar is a world-class development, in the ultra-desirable coastal Limassol, with an unobstructed sea view from all the apartments. This landmark development consists of luxury residences, five-star facilities and services as well as high-end shops and restaurants. 

*Time lapse video:  https://youtu.be/TKnPsOP977o